Hi,
Today (4th Feb) at 10:30 PM UTC, we will be making a change to temporarily serve the Flow Testnet EVM Gateway API endpoints from the QuickNode Flow Testnet community EVM GW node setup instead of the EVM GW node run by the foundation.
There will be no change to the endpoints other than being served by QuickNode EVM GW for an hour.
The switch will however cause the Testnet EVM GW API endpoints to be unavailable for 15 to 20 seconds at that time.
This is being done to test the QuickNode EVM GW with real-world traffic in preparation for the switchover of the mainnet traffic.
Thank you,
Flow Team