[Action Required] Please update EVM GW node to v1.1.1-experimental.0 before Thursday, 15th May 10 AM Pacific

Hello EVM GW operators,

If you are running a testnet or mainnet Flow EVM Gateway (GW) node, please upgrade it to the following docker tags:

  1. If you have enabled using soft-finality on the EVM GW by adding the --experimental-soft-finality-enabled=true tag, then upgrade to docker tag v1.1.1-experimental.0.

  2. If you have not enabled soft-finality, then upgrade to v1.1.1.

If you build the images from source instead of using the docker images, then please build the image from this release tag: Release v1.1.1 · onflow/flow-evm-gateway · GitHub.

This update introduces the Ethereum Pectra update.

No update is needed for any other Flow node type.

Thank you,
Flow Team